Index 005
Journal
Occasional. We write when something in a project turned out to be worth saying.
- Since 2018
- Occasional
- No newsletter
Journal
Occasional
- 14.07.26CraftSpecifying vinyl grade is design workThe gap between a drawing and an installation is where most identity systems quietly die. Ours is written into the contract.
- 28.05.26StudioWhy we take four projects a yearA deliberate ceiling, not a capacity problem. What it costs us and what it buys the work.
- 09.03.26TypographyDrawing a Vietnamese diacritic set that survives 4ptStacked diacritics break first. A working note on the compromises we made for the Cảng Sài Gòn typeface.
- 17.01.26PracticeThe first year is when a system holds or rotsTwelve months of stewardship is in every contract. Here is what we actually do during it.
- 02.09.26PracticeA second weight is a decision someone will get wrongOn designing identity systems for people who will never read the guidelines, at three in the morning, in the rain.
Contact
Tell us where the brand has to survive.
studio@fieldandframe.vnWe take four to six projects a year and book two quarters ahead. A first conversation is an hour, no deck, and we will tell you honestly if we are the wrong studio for it.
- +84 24 3936 4180
- 18 Ngõ Huyện, Hoàn Kiếm, Hà Nội
- Taking commissions from Q3 2026